10 CFR §36.53
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)The licensee shall have and follow written operating procedures for—
- (1)Operation of the irradiator, including entering and leaving the radiation room;
- (2)Use of personnel dosimeters;
- (3)Surveying the shielding of panoramic irradiators;
- (4)Monitoring pool water for contamination while the water is in the pool and before release of pool water to unrestricted areas;
- (5)Leak testing of sources;
- (6)Inspection and maintenance checks required by § 36.61;
- (7)Loading, unloading, and repositioning sources, if the operations will be performed by the licensee; and
- (8)Inspection of movable shielding required by § 36.23(h), if applicable.
- (b)The licensee shall have and follow emergency or abnormal event procedures, appropriate for the irradiator type, for—
- (1)Sources stuck in the unshielded position;
- (2)Personnel overexposures;
- (3)A radiation alarm from the product exit portal monitor or pool monitor;
- (4)Detection of leaking sources, pool contamination, or alarm caused by contamination of pool water;
- (5)A low or high water level indicator, an abnormal water loss, or leakage from the source storage pool;
- (6)A prolonged loss of electrical power;
- (7)A fire alarm or explosion in the radiation room;
- (8)An alarm indicating unauthorized entry into the radiation room, area around pool, or another alarmed area;
- (9)Natural phenomena, including an earthquake, a tornado, flooding, or other phenomena as appropriate for the geographical location of the facility; and
- (10)The jamming of automatic conveyor systems.
- (c)The licensee may revise operating and emergency procedures without Commission approval only if all of the following conditions are met:
- (1)The revisions do not reduce the safety of the facility,
- (2)The revisions are consistent with the outline or summary of procedures submitted with the license application,
- (3)The revisions have been reviewed and approved by the radiation safety officer, and
- (4)The users or operators are instructed and tested on the revised procedures before they are put into use.