10 CFR §36.83
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)In addition to the reporting requirements in other parts of NRC regulations, the licensee shall report the following events if not reported under other parts of NRC regulations:
- (1)Source stuck in an unshielded position.
- (2)Any fire or explosion in a radiation room.
- (3)Damage to the source racks.
- (4)Failure of the cable or drive mechanism used to move the source racks.
- (5)Inoperability of the access control system.
- (6)Detection of radiation source by the product exit monitor.
- (7)Detection of radioactive contamination attributable to licensed radioactive material.
- (8)Structural damage to the pool liner or walls.
- (9)Abnormal water loss or leakage from the source storage pool.
- (10)Pool water conductivity exceeding 100 microsiemens per centimeter.
- (b)The report must include a telephone report within 24 hours as described in § 30.50(c)(1), and a written report within 30 days as described in § 30.50(c)(2).