10 CFR §71.35
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
The application must include the following:
- (a)A demonstration that the package satisfies the standards specified in subparts E and F of this part;
- (b)For a fissile material package, the allowable number of packages that may be transported in the same vehicle in accordance with § 71.59; and
- (c)For a fissile material shipment, any proposed special controls and precautions for transport, loading, unloading, and handling and any proposed special controls in case of an accident or delay.