StacksVerified U.S. federal law reference

10 CFR §960.5-2-10 — -2-10 Hydrology.

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
  1. (a)Qualifying condition. The site shall be located such that the geohydrologic setting of the site will (1) be compatible with the activities required for repository construction, operation, and closure; (2) not compromise the intended functions of the shaft liners and seals; and (3) permit the requirements specified in § 960.5-1(a)(3) to be met.
  2. (b)Favorable conditions.
    1. (1)Absence of aquifers between the host rock and the land surface.
    2. (2)Absence of surface-water systems that could potentially cause flooding of the repository.
    3. (3)Availability of the water required for repository construction, operation, and closure.
  3. (c)Potentially adverse condition. Ground-water conditions that could require complex engineering measures that are beyond reasonably available technology for repository construction, operation, and closure.
  4. (d)Disqualifying condition. A site shall be disqualified if, based on expected ground-water conditions, it is likely that engineering measures that are beyond reasonably available technology will be required for exploratory-shaft construction or for repository construction, operation, or closure.