10 CFR §963.10
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)The scope of this subpart includes the following for both the preclosure and postclosure periods:
- (1)The bases for the suitability determination for the Yucca Mountain site as a location for a geologic repository;
- (2)The suitability evaluation methods for applying the site suitability criteria to a geologic repository at the Yucca Mountain site; and
- (3)The site suitability criteria that DOE will apply in accordance with section 113(b)(1)(A)(iv) of the NWPA.
- (b)DOE will seek NRC concurrence on any future revisions to this subpart.