14 CFR §31.57
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)If a rip cord is used for emergency deflation, it must be designed and installed to preclude entanglement.
- (b)The force required to operate the rip cord may not be less than 25, or more than 75, pounds.
- (c)The end of the rip cord to be operated by the pilot must be colored red.
- (d)The rip cord must be long enough to allow an increase of at least 10 percent in the vertical dimension of the envelope.