StacksVerified U.S. regulatory reference

14 CFR §65.39

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
Each applicant for a facility rating at any air traffic control tower must have satisfactorily served—
  1. (a)As an air traffic control tower operator at that control tower without a facility rating for at least 6 months; or
  2. (b)As an air traffic control tower operator with a facility rating at a different control tower for at least 6 months before the date he applies for the rating.