14 CFR §65.41
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
Each applicant for a facility rating at an air traffic control tower must have passed a practical test on each item listed in § 65.37 of this part that is applicable to each operating position at the control tower at which the rating is sought.