15 CFR §400.25
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
In addition to the requirements of §§ 400.21(d)(1)(i) and (ii) pertaining to legal authority, § 400.21(d)(2)(vii) pertaining to environmental aspects of the proposal, and § 400.21(d)(3)(i) and (iii) pertaining to operation, a grantee's application for subzone designation shall contain the following information:
- (a)The name of the operator/user for which subzone designation is sought;
- (b)The nature of the activity at the proposed subzone;
- (c)The address(es) and physical size (acreage or square feet) of the proposed subzone location(s); and
- (d)One or more maps conforming to the requirements of section § 400.21(d)(5)(ii). For any production activity to be conducted at a proposed subzone, the separate requirements of § 400.14(a) must be met.