19 CFR §115.28
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
Each application by a manufacturer or an owner for certification of a container by design type must include:
- (a)Three copies, each no larger than 3 feet by 4 feet, of the customs and TIR/Container plan;
- (b)Customs and TIR/Container plan number;
- (c)Three copies of the specifications which include the following information:
- (d)The location and date for inspection; and
- (e)A statement signed by the manufacturer that:
- (1)A container of the design type concerned is available for inspection and approval by the Certifying Authority before, during, and after the production run;
- (2)Notification will be given to the Certifying Authority of each change in the design before adoption; and
- (3)Each container will be marked with: