A written request for approval of a container after manufacture may be made by the owner or operator to a Certifying Authority and must include the following:
- (a)Three copies, each no longer than 3 feet by 4 feet, of the Customs and TIR/Container plan;
- (b)Customs and TIR/Container plan number;
- (c)Three copies of the specifications which include the following information:
- (1)Type of container;
- (2)Name and business address of applicant;
- (3)Identification marks and numbers;
- (4)Tare weight;
- (5)Nominal overall dimensions in centimeters;
- (6)Type of construction and essential particulars of structure (nature of materials, coating system used, parts which are reinforced, whether bolts are riveted or welded, and similar matters); and
- (7)Proposed location and date for inspection of the container.