CFR › Title 23 › Part 636 › §636.10523 CFR §636.105Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗Copy linkNo, the FHWA is neither requiring nor promoting the use of the design-build contracting method. The design-build contracting technique is optional.