StacksVerified U.S. regulatory reference

23 CFR §750.307

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
Authorization to proceed with acquisitions on a sign removal project shall not be issued until such time as the State has submitted to FHWA the following:
  1. (a)A general description of the project.
  2. (b)The total number of signs to be acquired.
  3. (c)The total estimated cost of the sign removal project, including a breakdown of incidental, acquisition and removal costs.