24 CFR §3282.408
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)Manufacturer's plan required. Except as provided in § 3282.407, if a manufacturer determines that it is responsible for providing notification under § 3282.405, the manufacturer must prepare a plan in accordance with this section and § 3282.409. The manufacturer must, as soon as practical, but not later than 20 days after making the determination of defect, serious defect, or imminent safety hazard, submit the plan for approval to one of the following, as appropriate:
- (b)Implementation of plan. Upon approval of the plan, including any changes for cause required by the Secretary or SAA after consultation with the manufacturer, the manufacturer must carry out the approved plan within the agreed time limits.