You must include the following with the APD:
- (a)Rated capacities of the drilling rig and major drilling equipment, if not already on file with the appropriate District office;
- (b)A drilling fluids program that includes the minimum quantities of drilling fluids and drilling fluid materials, including weight materials, to be kept at the site;
- (c)A proposed directional plot if the well is to be directionally drilled;
- (d)A Hydrogen Sulfide Contingency Plan (see § 250.490), if applicable, and not previously submitted;
- (e)A welding plan (see §§ 250.109 to 250.113) if not previously submitted;
- (f)In areas subject to subfreezing conditions, evidence that the drilling equipment, BOP systems and components, diverter systems, and other associated equipment and materials are suitable for operating under such conditions;
- (g)A request for approval, if you plan to wash out or displace cement to facilitate casing removal upon well abandonment. Your request must include a description of how far below the mudline you propose to displace cement and how you will visually monitor returns;
- (h)Certification of your casing and cementing program as required in § 250.420(a)(7); and
- (i)Such other information as the District Manager may require.
- (j)For Arctic OCS exploratory drilling operations, you must provide the information required by § 250.470.