30 CFR §250.423
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
You must ensure proper installation of casing in the subsea wellhead or liner in the liner hanger.
- (a)You must ensure that the latching mechanisms or lock down mechanisms are engaged upon successfully installing the casing string.
- (b)If you run a liner that has a latching mechanism or lock down mechanism, you must ensure that the latching mechanisms or lock down mechanisms are engaged upon successfully installing the liner.
- (c)You must perform a pressure test on the casing seal assembly to ensure proper installation of casing or liner. You must perform this test for the intermediate and production casing strings or liners.