StacksVerified U.S. regulatory reference

30 CFR §250.503

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
When well-completion operations are conducted on a platform where there are other hydrocarbon-producing wells or other hydrocarbon flow, an emergency shutdown system (ESD) manually controlled station shall be installed near the driller's console or well-servicing unit operator's work station.