StacksVerified U.S. regulatory reference

30 CFR §250.525

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
You must take action if you have any of the following conditions:
  1. (a)Any fixed platform well with a casing pressure exceeding its maximum allowable wellhead operating pressure (MAWOP);
  2. (b)Any fixed platform well with a casing pressure that is greater than 100 psig and that cannot bleed to 0 psig through a 1/2-inch needle valve within 24 hours, or is not bled to 0 psig during a casing diagnostic test;
  3. (c)Any well that has demonstrated tubing/casing, tubing/riser, casing/casing, riser/casing, or riser/riser communication;
  4. (d)Any well that has sustained casing pressure (SCP) and is bled down to prevent it from exceeding its MAWOP, except during initial startup operations described in § 250.522;
  5. (e)Any hybrid well with casing or riser pressure exceeding 100 psig; or
  6. (f)Any subsea well with a casing pressure 100 psig greater than the external hydrostatic pressure at the subsea wellhead.