30 CFR §250.620
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
The lessee shall comply with the following requirements during routine, as defined in § 250.601 of this part, and nonroutine wireline workover operations:
- (a)Wireline operations shall be conducted so as to minimize leakage of well fluids. Any leakage that does occur shall be contained to prevent pollution.
- (b)All wireline perforating operations and all other wireline operations where communication exists between the completed hydrocarbon-bearing zone(s) and the wellbore shall use a lubricator assembly containing at least one wireline valve.
- (c)When the lubricator is initially installed on the well, it shall be successfully pressure tested to the expected shut-in surface pressure.