30 CFR §250.760
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)For snubbing operations, you must follow the applicable requirements of this subpart and have the following minimum BOP-system components:
- (1)One set of pipe rams hydraulically operated,
- (2)Two sets of stripper-type pipe rams hydraulically operated with spacer spool,
- (3)An inside BOP or a spring-loaded, back-pressure safety valve in the open position located on the rig floor, and
- (4)An essentially full-opening, work-string safety valve in the open position must be maintained on the rig floor at all times and a wrench to fit the work-string safety valve must be readily available.
- (5)Proper connections must be readily available for inserting valves in the work string.
- (b)Test the snubbing unit in accordance with § 250.737(a), (b), and (c).