30 CFR §250.815
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)You must equip all new dry tree completions (perforated but not placed on production) and completions that are shut-in for a period of 6 months with one of the following:
- (b)When warranted by conditions such as permafrost, unstable bottom conditions, hydrate formation, and paraffin problems, the District Manager must approve the setting depth of the subsurface safety device for a shut-in well on a case-by-case basis.