30 CFR §250.832
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)You must equip all tubing installations that have a wireline- or pump down-retrievable subsurface safety device installed after May 31, 1988, with a landing nipple, with flow couplings, or other protective equipment above and below it to provide for the setting of the device.
- (b)The control system for all surface-controlled SSSVs must be an integral part of the platform ESD.
- (c)In addition to the activation of the ESD by manual action on the platform, the system may be activated by a signal from a remote location.