30 CFR §250.857
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)You must install a pressure relief system or an adequate vent on the glycol regenerator (reboiler) to prevent over pressurization. The discharge of the relief valve must be vented in a nonhazardous manner.
- (b)You must install the FSV on the dry glycol inlet to the glycol contact tower as near as practical to the glycol contact tower.
- (c)You must install the shutdown valve (SDV) on the wet glycol outlet from the glycol contact tower as near as practical to the glycol contact tower.