30 CFR §250.873
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
If you choose to install a subsea gas lift system, you must design your system as approved in your DWOP or as follows:
- (a)Design the gas lift supply pipeline in accordance with API RP 14C (incorporated by reference as specified in § 250.198) for the gas lift supply system located on the platform.
- (b)Meet the applicable requirements in the following table:
- (c)Follow the valve closure times and hydraulic bleed requirements according to your approved DWOP for the following:
- (d)Follow the gas lift system valve testing requirements according to the following table: