30 CFR §250.874
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
If you choose to install a subsea water injection system, your system must comply with your approved DWOP, which must meet the following minimum requirements:
- (a)Adhere to the water injection requirements described in API RP 14C (incorporated by reference as specified in § 250.198) for the water injection equipment located on the platform. In accordance with § 250.830, either a surface-controlled SSSV or a water injection valve (WIV) that is self-activated and not controlled by emergency shut-down (ESD) or sensor activation must be installed in a subsea water injection well.
- (b)Equip a water injection pipeline with a surface FSV and water injection shutdown valve (WISDV) on the surface facility.
- (c)Install a PSHL sensor upstream (in-board) of the FSV and WISDV.
- (d)Use subsea tree(s), wellhead(s), connector(s), and tree valves, and surface-controlled SSSV or WIV associated with a water injection system that are rated for the maximum anticipated injection pressure.
- (e)Consider the effects of hydrogen sulfide (H2S) when designing your water flood system, as required by § 250.805.
- (f)Follow the valve closure times and hydraulic bleed requirements according to your approved DWOP for the following:
- (g)Comply with the following injection valve testing requirements:
- (1)You must test your injection valves as provided in the following table:
- (2)If a designated USV on a water injection well fails the applicable test under § 250.880(c)(4)(ii), you must notify the appropriate District Manager and request approval to designate another ANSI/API Spec 6A and API Spec. 6AV1 (both incorporated by reference in § 250.198) certified subsea valve as your USV.
- (3)If a USV on a water injection well fails the test and the surface-controlled SSSV or WIV cannot be tested as required under (g)(1)(ii) of this section because of low reservoir pressure, you must submit a request to the appropriate District Manager with an alternative plan that ensures subsea shutdown capabilities.
- (h)If you experience a loss of communications during water injection operations, you must comply with the following: