30 CFR §285.833
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)For any incident covered under § 285.831, you must submit a written report within 15 days after the incident to BSEE. The report must contain the following information:
- (1)Date and time of occurrence;
- (2)Identification and contact information for each lessee, grant holder, or operator;
- (3)Name and telephone number of the contractor and the contractor's representative, if a contractor is involved in the incident or injury;
- (4)Lease number, OCS area, and block;
- (5)Platform/facility name and number, or cable or pipeline segment number;
- (6)Type of incident or injury;
- (7)Activity at time of incident;
- (8)Description of incident, damage, or injury (including days away from work, restricted work, or job transfer), and any corrective action taken; and
- (9)Property or equipment damage estimate (in U.S. dollars).
- (b)You may submit a report or form prepared for another agency in lieu of the written report required by paragraph (a) of this section if the report or form contains all required information.
- (c)BSEE may require you to submit additional information about an incident on a case-by-case basis.