30 CFR §550.241
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
Your DPP or DOCD must include the following:
- (a)Description, objectives, and schedule. A description, discussion of the objectives, and tentative schedule (from start to completion) of the development and production activities you propose to undertake. Examples of development and production activities include:
- (b)Location. The location and water depth of each of your proposed wells and production facilities. Include a map showing the surface and bottom-hole location and water depth of each proposed well, the surface location of each production facility, and the locations of all associated drilling unit and construction barge anchors.
- (c)Drilling unit. A description of the drilling unit and associated equipment you will use to conduct your proposed development drilling activities. Include a brief description of its important safety and pollution prevention features, and a table indicating the type and the estimated maximum quantity of fuels and oil that will be stored on the facility (see definition of “facility (3)” under § 550.105).
- (d)Production facilities. A description of the production platforms, satellite structures, subsea wellheads and manifolds, lease term pipelines (see definition at § 550.105), production facilities, umbilicals, and other facilities you will use to conduct your proposed development and production activities. Include a brief description of their important safety and pollution prevention features, and a table indicating the type and the estimated maximum quantity of fuels and oil that will be stored on the facility (see definition of “facility (3)” under § 550.105).
- (e)Service fee. You must include payment of the service fee listed in § 550.125.