CFR › Title 30 › Part 56 › §56.660330 CFR §56.6603Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗Copy linkAt least a 15-foot air gap shall be provided between the blasting circuit and the electric power source.