StacksVerified U.S. regulatory reference

30 CFR §56.6802

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
No welding or cutting shall be performed on a bulk delivery vehicle until the vehicle has been washed down and all explosive material has been removed. Before welding or cutting on a hollow shaft, the shaft shall be thoroughly cleaned inside and out and vented with a minimum 1/2-inch diameter opening to allow for sufficient ventilation.