CFR › Title 30 › Part 56 › §56.701030 CFR §56.7010Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗Copy linkIn the event of power failure, drill controls shall be placed in the neutral position until power is restored.