- (a)When the nonelectric initiation system uses shock tube—
- (1)Connections with other initiation devices shall be secured in a manner which provides for uninterrupted propagation;
- (2)Factory-made units shall be used as assembled and shall not be cut except that a single splice is permitted on the lead-in trunkline during dry conditions; and
- (3)Connections between blastholes shall not be made until immediately prior to clearing the blast site when surface delay detonators are used.
- (b)When the nonelectric initiation system uses detonating cord—
- (1)The line of detonating cord extending out of a blasthole shall be cut from the supply spool immediately after the attached explosive is correctly positioned in the hole;
- (2)In multiple row blasts, the trunkline layout shall be designed so that the detonation can reach each blasthole from at least two directions;
- (3)Connections shall be tight and kept at right angles to the trunkline;
- (4)Detonators shall be attached securely to the side of the detonating cord and pointed in the direction in which detonation is to proceed;
- (5)Connections between blastholes shall not be made until immediately prior to clearing the blast site when surface delay detonators are used; and
- (6)Lead-in lines shall be manually unreeled if connected to the trunklines at the blast site.
- (c)When nonelectric initiation systems use gas tube, continuity of the circuit shall be tested prior to blasting.