30 CFR §7.63
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)Each application for approval of a blasting unit shall include the following:
- (1)An overall assembly drawing showing the physical construction of the blasting unit.
- (2)A schematic diagram of the electric circuit.
- (3)A parts list specifying each electric component and its electrical ratings, including tolerances.
- (4)A layout drawing showing the location of each component and wiring.
- (5)The model number or other manufacturer's designation of the blasting unit.
- (b)All drawings shall be titled, numbered, dated, and include the latest revision number. The drawings may be combined into one or more composite drawings.
- (c)The application shall contain a list of all the drawings submitted, including drawing titles, numbers, and revisions.
- (d)A detailed technical description of the operation and use of the blasting unit shall be submitted with the application.