30 CFR §75.1323
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)Blasting circuits shall be protected from sources of stray electric current.
- (b)Detonators made by different manufacturers shall not be combined in the same blasting circuit.
- (c)Detonator leg wires shall be shunted until connected into the blasting circuit.
- (d)Blasting cables shall be—
- (e)Blasting cables shall be shunted until immediately before firing, except when testing for circuit continuity.
- (f)Wire used between the blasting cable and detonator circuitry shall—
- (g)Each wire connection in a blasting circuit shall be—
- (h)Uninsulated connections in each blasting circuit shall be kept out of water and shall not contact the coal, roof, ribs, or floor.
- (i)When 20 or fewer boreholes are fired in a round, the blasting circuit shall be wired in a single series.
- (j)Immediately prior to firing, all blasting circuits shall be tested for continuity and resistance using a blasting galvanometer or other instrument specifically designed for testing blasting circuits.