30 CFR §75.206
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)Except in anthracite mines using non-mechanized mining systems, when conventional roof support materials are used as the only means of support—
- (1)The width of any opening shall not exceed 20 feet;
- (2)The spacing of roadway roof support shall not exceed 5 feet;
- (3)
- (4)Straight roadways shall not exceed 16 feet wide where full overhead support is used and 14 feet wide where only posts are used;
- (5)Curved roadways shall not exceed 16 feet wide; and
- (6)The roof at the entrance of all openings along travelways which are no longer needed for storing supplies or for travel of equipment shall be supported by extending the line of support across the opening.
- (b)Conventional roof support materials shall meet the following specifications:
- (c)A cluster of two or more posts that provide equivalent strength may be used to meet the requirements of paragraph (b)(1) of this section, except that no post shall have a diameter less than 4 inches or have a cross-sectional area less than 13 square inches.
- (d)Materials other than wood used for support shall have support strength at least equivalent to wooden material meeting the applicable provisions of this section.
- (e)Posts and jacks shall be tightly installed on solid footing.
- (f)When posts are installed under roof susceptible to sloughing a cap block, plank, crossbar or materials that are equally effective shall be placed between the post and the roof.
- (g)Blocks used for lagging between the roof and crossbars shall be spaced to distribute the load.
- (h)Jacks used for roof support shall be used with at least 36 square inches of roof bearing surface.