StacksVerified U.S. regulatory reference

30 CFR §77.1000

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
Each operator shall establish and follow a ground control plan for the safe control of all highwalls, pits and spoil banks to be developed after June 30, 1971, which shall be consistent with prudent engineering design and will insure safe working conditions. The mining methods employed by the operator shall be selected to insure highwall and spoil bank stability.