30 CFR §77.214
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)Refuse piles constructed on or after July 1, 1971, shall be located in areas which are a safe distance from all underground mine airshafts, preparation plants, tipples, or other surface installations and such piles shall not be located over abandoned openings or steamlines.
- (b)Where new refuse piles are constructed over exposed coal beds the exposed coal shall be covered with clay or other inert material as the piles are constructed.
- (c)A fireproof barrier of clay or inert material shall be constructed between old and new refuse piles.
- (d)Roadways to refuse piles shall be fenced or otherwise guarded to restrict the entrance of unauthorized persons.