Part 780 — Surface Mining Permit Applications—Minimum Requirement for Reclamation and Operation Plan
- § 780.1— Scope.
- § 780.2— Objectives.
- § 780.4— Responsibilities.
- § 780.10— Information collection.
- § 780.11— Operation plan: General requirements.
- § 780.12— Operation plan: Existing structures.
- § 780.13— Operation plan: Blasting.
- § 780.14— Operation plan: Maps and plans.
- § 780.15— Air pollution control plan.
- § 780.16— Fish and wildlife information.
- § 780.18— Reclamation plan: General requirements.
- § 780.21— Hydrologic information.
- § 780.22— Geologic information.
- § 780.23— Reclamation plan: Land use information.
- § 780.25— Reclamation plan: Siltation structures, impoundments, banks, dams, and embankments.
- § 780.27— Reclamation plan: Surface mining near underground mining.
- § 780.29— Diversions.
- § 780.31— Protection of publicly owned parks and historic places.
- § 780.33— Relocation or use of public roads.
- § 780.35— Disposal of excess spoil.
- § 780.37— Road systems.
- § 780.38— Support facilities.