StacksVerified U.S. regulatory reference

33 CFR §117.234

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
The SR 36 Bridge, mile 0.5 in Cedar Beach, shall open on signal. From April 1 through November 30 from 2 a.m. to 4 a.m.; and from December 1 through March 31 from 6:30 p.m. to 6 a.m., the draw shall open on signal if at least four hours notice is given.