33 CFR §117.319
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)The draw of the Sharpes Ferry (SR 40) bridge, mile 55.1 shall open on signal if at least three hours notice is given.
- (b)The draw of the Moss Bluff (SR 464) bridge, mile 66.0, need not open for the passage of vessels.
- (c)The draw of the Muclan Farms bridge, mile 63.9, need not open for the passage of vessels.