StacksVerified U.S. regulatory reference

33 CFR §117.319

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
  1. (a)The draw of the Sharpes Ferry (SR 40) bridge, mile 55.1 shall open on signal if at least three hours notice is given.
  2. (b)The draw of the Moss Bluff (SR 464) bridge, mile 66.0, need not open for the passage of vessels.
  3. (c)The draw of the Muclan Farms bridge, mile 63.9, need not open for the passage of vessels.