33 CFR §117.459
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
The draw of the S27 bridge mile 0.7 at Hackberry, shall operate as follows:
- (a)From May 20, through October 31, the draw shall open on signal from 7 a.m. to 7 p.m. From 7 p.m. to 7 a.m., the draw shall open on signal if at least four hours notice is given.
- (b)From November 1 through December 22, the draw shall open on signal from 7 a.m. to 3 p.m. From 3 p.m. to 7 a.m., the draw shall open on signal if at least four hours notice is given.
- (c)From December 23 through May 19, the draw shall open on signal if at least 24 hours notice is given.