StacksVerified U.S. regulatory reference

33 CFR §117.480

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
The draw of the S82 bridge, mile 7.1 at Grand Chenier, shall open on signal; except that, from 6 p.m. to 6 a.m. the draw shall open on signal if at least 4 hours notice is given. During the advance notice period, the draw will open on less than 4 hours notice for an emergency and will open on demand should a temporary surge in waterway traffic occur.