StacksVerified U.S. regulatory reference

33 CFR §117.533

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
The draw of the Maine Central Railroad Bridge, mile 15.0, between Wiscasset and North Edgecombe, Maine, need not be opened for the passage of vessels. The draw of the Maine Central Railroad Bridge shall be returned to operable condition within six months after notification by the District Commander to do so.