StacksVerified U.S. regulatory reference

33 CFR §117.565

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
The draw of the Route S370 bridge, mile 10.0 at Easton, Maryland, shall open on signal; except that from November 1 through March 31, 24 hours a day, and from April 1 through October 31, from 6 p.m. to 6 a.m., a six-hour advance notice to the drawtender is required for bridge openings.