33 CFR §117.587
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)The draw of the Padanaram Bridge, mile 1.0, shall open on signal from 1 May through 31 October, between 6 a.m. and 9 p.m., daily, as follows:
- (b)At all other times the bridge shall open if at least four (4) hours advance notice is given.
- (c)The owners of this bridge shall provide and maintain mooring facilities for vessels to make fast while waiting for the bridge to open.
- (d)The owners of this bridge shall provide and keep in good legible condition, clearance gauges for each draw with figures not less than twelve (12) inches high designed, installed and maintained according to the provisions of section 118.160 of this chapter.