33 CFR §117.797
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)The drawspan for each drawbridge listed in this section must open as soon as possible for public vessels of the United States.
- (b)The draw of the US2 Bridge, mile 91.8, over Lake Champlain, between South Hero Island and North Hero Island, shall operate as follows:
- (1)The draw shall open on signal on the hour and the half hour from May 15th through October 15th from 8 a.m. to 8 p.m. daily.
- (2)The draw shall open on signal from May 15th through October 15th from 8 p.m. to 8 a.m. if at least four hours notice is given by calling the number posted at the bridge.
- (3)The draw shall open on signal from October 16th through May 14th if at least four hours notice is given by calling the number posted at the bridge.
- (c)The draw of the Central Vermont Railway bridge across Missisquoi Bay, mile 105.6 shall open on signal: