StacksVerified U.S. regulatory reference

33 CFR §117.835

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
The draw of the US17 bridge, mile 12.0 at Hertford, shall open on signal from 8 a.m. to midnight from April 1 through September 30 and from 10 a.m. to 10 p.m. from October 1 through March 31. The draw need not be opened at all other times.