33 CFR §117.889
- (a)The draw of the US101 bridge, mile 5.0 at Florence, shall open on signal if at least two hours notice is given.
- (b)The draw of the Central Oregon and Pacific railroad bridge, mile 8.0 near Cushman, shall open on signal if at least 24 hours notice is given.