StacksVerified U.S. regulatory reference

33 CFR §117.913

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
The draw of the Seaboard System Railroad bridge, mile 32.0 at Ashepoo, need not be opened for the passage of vessels. However, the draw shall be returned to operable condition within six months after notification by the District Commander to do so.