33 CFR §117.955
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
The draw of the Houston Belt and Terminal railroad bridge, mile 1.2 at Houston, and all drawbridges downstream of it, shall open on signal if at least 24 hours' notice if given.