StacksVerified U.S. regulatory reference

33 CFR §117.984

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
The draw of the Union Pacific railroad bridge, mile 20.7 near Brazoria, shall open on signal; except that, from 10 a.m. to 2 p.m. and 10 p.m. to 2 a.m., the draw shall open on signal if at least three hours notice is given.